1/8/18 FAITH WORKS COALITION 2017 PROJECT COMPLETION REPORTS 1. January 2, 2017, Kemps Lake Drive, VB. A single lady with two children had been told by the gas company that her water heater was leaking water onto the burner. She also was having trouble with the gas furnace. Our HVAC contractor cleaned the WH burner […]

Faith Works Coalition - 2016 Summary of Projects
0

Faith Works Coalition – 2016 Summary of Projects

2016  SUMMARY of  PROJECTS   January 3, Stoney Creek Arch, Ches. Mother and adult daughter living in nice townhouse.  FWC volunteers repaired the bathroom ceiling where there had been a leak from the townhouse above.  FWC incurred no cost for this project.  5 volunteer hours were expended.   January 7, Nautilus Ave., Ches. FWC engaged […]

Faith Works Coalition - 2015 Summary of Projects
0

Faith Works Coalition – 2015 Summary of Projects

January 1, Shell Rd., VB. A former client had a failed water heater FWC purchased and installed a new water heater.  Cost was $294 and 7 volunteer hours. January 6, Spartin St., VB. Former client reported electrical problems.  FWC Project Managers investigated and found that one of the problems was previously addressed by an electrical […]

Faith Works Coalition - 2014 Summary of Projects
0

Faith Works Coalition – 2014 Summary of Projects

1. Virginia Beach Blvd (MHP) – Jan 15. A plumber was called to repair interior and exterior leaks. He fixed two hot water tank leaks and a leaking pipe under the trailer. Total cost was $300. 2. Gadwall Court – Jan 18 During the survey FWC learned that heat pump had been inoperative for several […]

Faith Works Coalition - 2013 Summary of Projects
0

Faith Works Coalition – 2013 Summary of Projects

1.  Dark Star Run, Derby Run MHP – January 25, 2013.  FWC’s HVAC contractor donated his time to make repairs for two disabled ladies.  The broken heat pump was fixed.  Volunteers repaired several roof leaks. FWC contacted the Virginia STOP organization to replace deteriorated heat ducts.   Total cost to FWC was $250. 2.  Dark Star […]

Faith Works Coalition - 2012 Summary of Projects
0

Faith Works Coalition – 2012 Summary of Projects

1. Cathedral Dr. –  Jan 5/6, 2012:  FWC was assisted by a local roofing contractor from Wave Church who donated the labor to completely re-roof this two story townhouse.   FWC cost of materials- $2,000.   2. Longwood Rd. – Jan 9, 2012:  A roofing contractor made repairs to this aging roof.  Vent collars were installed; […]

Faith Works Coalition  - 2011 Summary of Projects
0

Faith Works Coalition – 2011 Summary of Projects

Summary of projects completed in the 2011 calendar year

Happy Volunteers
0

Faith Works Coalition – 2010 Summary of Projects

Summary of projects completed in the 2010 calendar year

Baja Court Ramp
0

Faith Works Coalition – 2009 Summary of Projects

Summary of Faith Works Coalition’s 2009 projects

Rick-Galliford-Fred-Jones-Ed-Johansen
0

Faith Works Coalition – 2008 Summary of Projects

Check out the projects that Faith Works Coalition was involved with in 2008.